| 1 |
MR0233_Thal_Aramba_Proposed BOQ.xlsx |
2000109774 |
OSP-OFN-AC0130 |
Installation of 8C fiber cable with 4 core tubes (G.652.d) - Aerial |
m |
383.00 |
444.0 |
170,052.00 |
| 2 |
MR0233_Thal_Aramba_Proposed BOQ.xlsx |
2000109779 |
OSP-OFN-SU9040 |
Supply of 8C fiber cable with 4 core tubes (G.652.d) - Aerial (Corning core, Prysmian,YOFC, ZTT or anyother Dialog approved cables) |
m |
247.00 |
474.0 |
117,078.00 |
| 3 |
MR0233_Thal_Aramba_Proposed BOQ.xlsx |
2000109832 |
OSP-OFN-SU9470 |
Supply of 96 fiber Dome type closure_(Commscope, Grandway or anyother Dialog approved brands) |
Each |
30,000.00 |
1.0 |
30,000.00 |
| 4 |
MR0233_Thal_Aramba_Proposed BOQ.xlsx |
2000109835 |
|
Installation of 96 Splicing Closure in the existing aerial Fiber Network |
Each |
8,904.00 |
1.0 |
8,904.00 |
| 5 |
MR0233_Thal_Aramba_Proposed BOQ.xlsx |
2000109871 |
OSP-OFN-TT4510 |
Termination of 2 core in OFC |
Each |
3,668.00 |
1.0 |
3,668.00 |
| 6 |
MR0233_Thal_Aramba_Proposed BOQ.xlsx |
2000109874 |
OSP-OFN-TT4620 |
Testing of 2 core in OFC |
Each |
644.00 |
1.0 |
644.00 |
| 7 |
MR0233_Thal_Aramba_Proposed BOQ.xlsx |
2000109862 |
OSP-OFN-SR12000 |
Service cost per location for OFN rearrangement work |
Each |
18,000.00 |
5.0 |
90,000.00 |
| 8 |
MR0233_Thal_Aramba_Proposed BOQ.xlsx |
2000109864 |
OSP-OFN-TT4720 |
Splicing 1 core |
Each |
2,219.00 |
1.0 |
2,219.00 |
| 9 |
MR0233_Thal_Aramba_Proposed BOQ.xlsx |
2000109865 |
OSP-OFN-TT4730 |
Splicing 2 core |
Each |
3,400.00 |
1.0 |
3,400.00 |
| 10 |
MR0233_Thal_Aramba_Proposed BOQ.xlsx |
2000109866 |
OSP-OFN-TT4740 |
Splicing 4core |
Each |
5,100.00 |
1.0 |
5,100.00 |
| 11 |
MR0233_Thal_Aramba_Proposed BOQ.xlsx |
2000109867 |
OSP-OFN-TT4750 |
Splicing 8core |
Each |
9,800.00 |
1.0 |
9,800.00 |
| 12 |
MR0233_Thal_Aramba_Proposed BOQ.xlsx |
2000109813 |
|
Installation of Poles and Accessories; 6.7m pole |
Per pole |
6,944.00 |
13.0 |
90,272.00 |
| 13 |
MR0233_Thal_Aramba_Proposed BOQ.xlsx |
2000109814 |
|
Installation of Poles and Accessories; 8m pole |
Per pole |
7,616.00 |
2.0 |
15,232.00 |
| 14 |
MR0233_Thal_Aramba_Proposed BOQ.xlsx |
2000109818 |
OSP-OFN-SU9970 |
Supply Poles; 6.7m pole (LL)_(AGGA, PATHMA or any other Dialog approved) |
per pole |
15,300.00 |
13.0 |
198,900.00 |
| 15 |
MR0233_Thal_Aramba_Proposed BOQ.xlsx |
2000109819 |
OSP-OFN-SU9980 |
Supply Poles; 8m pole_(AGGA, PATHMA or any other Dialog approved) |
per pole |
26,000.00 |
2.0 |
52,000.00 |
| 16 |
MR0233_Thal_Aramba_Proposed BOQ.xlsx |
2000109888 |
|
Supply & Installation of 14/10mm ID micro ducts (2 way composite duct x1) by using manual trenching method with warning tape and slab protection(Trench size 150mmx300mm), backfilling and reinstatement with asphalt,Concrete or paving blocks |
m |
6,402.00 |
3.0 |
19,206.00 |
| 17 |
MR0233_Thal_Aramba_Proposed BOQ.xlsx |
2000109822 |
|
Normal pole concreting |
per pole |
8,350.00 |
2.0 |
16,700.00 |
| 18 |
MR0233_Thal_Aramba_Proposed BOQ.xlsx |
2000109827 |
OSP-OFN-SU10110 |
Supply and Installation of extension bracket Horizontal 0.6m |
Each |
10,460.00 |
1.0 |
10,460.00 |
| 19 |
MR0233_Thal_Aramba_Proposed BOQ.xlsx |
2000109830 |
|
Obtaining way leave |
Per Authority |
68,750.00 |
1.0 |
68,750.00 |