| 1 |
CM1528_KDU_Werahera_Ind_Proposed BOQ.xlsx |
2000109831 |
OSP-OFN-SU9460 |
Supply of 48 fiber Dome type closure_(Commscope, Grandway or anyother Dialog approved brands) |
Each |
27,500.00 |
2.0 |
55,000.00 |
| 2 |
CM1528_KDU_Werahera_Ind_Proposed BOQ.xlsx |
2000109837 |
OSP-OFN-UG3040 |
Installation of 48 Splicing Closure in the existing UG Fiber Network. |
Each |
8,400.00 |
1.0 |
8,400.00 |
| 3 |
CM1528_KDU_Werahera_Ind_Proposed BOQ.xlsx |
2000109834 |
OSP-OFN-AC0730 |
Installation of 48 Splicing Closure in the existing aerial Fiber Network. |
Each |
6,846.00 |
1.0 |
6,846.00 |
| 4 |
CM1528_KDU_Werahera_Ind_Proposed BOQ.xlsx |
2000109871 |
OSP-OFN-TT4510 |
Termination of 2 core in OFC |
Each |
3,668.00 |
1.0 |
3,668.00 |
| 5 |
CM1528_KDU_Werahera_Ind_Proposed BOQ.xlsx |
2000109874 |
OSP-OFN-TT4620 |
Testing of 2 core in OFC |
Each |
644.00 |
1.0 |
644.00 |
| 6 |
CM1528_KDU_Werahera_Ind_Proposed BOQ.xlsx |
2000109872 |
OSP-OFN-TT4520 |
Termination of 4 core in OFC |
Each |
6,048.00 |
1.0 |
6,048.00 |
| 7 |
CM1528_KDU_Werahera_Ind_Proposed BOQ.xlsx |
2000109875 |
OSP-OFN-TT4630 |
Testing of 4 core in OFC |
Each |
1,204.00 |
1.0 |
1,204.00 |
| 8 |
CM1528_KDU_Werahera_Ind_Proposed BOQ.xlsx |
2000109862 |
OSP-OFN-SR12000 |
Service cost per location for OFN rearrangement work |
Each |
18,000.00 |
5.0 |
90,000.00 |
| 9 |
CM1528_KDU_Werahera_Ind_Proposed BOQ.xlsx |
2000109864 |
OSP-OFN-TT4720 |
Splicing 1 core |
Each |
2,219.00 |
1.0 |
2,219.00 |
| 10 |
CM1528_KDU_Werahera_Ind_Proposed BOQ.xlsx |
2000109865 |
OSP-OFN-TT4730 |
Splicing 2 core |
Each |
3,400.00 |
1.0 |
3,400.00 |
| 11 |
CM1528_KDU_Werahera_Ind_Proposed BOQ.xlsx |
2000109866 |
OSP-OFN-TT4740 |
Splicing 4core |
Each |
5,100.00 |
1.0 |
5,100.00 |
| 12 |
CM1528_KDU_Werahera_Ind_Proposed BOQ.xlsx |
2000109867 |
OSP-OFN-TT4750 |
Splicing 8core |
Each |
9,800.00 |
1.0 |
9,800.00 |
| 13 |
CM1528_KDU_Werahera_Ind_Proposed BOQ.xlsx |
2000109868 |
OSP-OFN-TT4760 |
Splicing 12core |
Each |
0.00 |
1.0 |
0.00 |
| 14 |
CM1528_KDU_Werahera_Ind_Proposed BOQ.xlsx |
2000109792 |
OSP-OFN-UG2780 |
Installation of 8C fiber cable with 4 core tubes (G.652.d) -UG |
m |
294.00 |
464.0 |
136,416.00 |
| 15 |
CM1528_KDU_Werahera_Ind_Proposed BOQ.xlsx |
2000109797 |
OSP-OFN-SU9340 |
Supply of 8C fiber cable with 4 core tubes (G.652.d) -UG_(Corning core, Prysmian,YOFC, ZTT or any other Dialog approved cables) |
m |
182.00 |
497.0 |
90,454.00 |
| 16 |
CM1528_KDU_Werahera_Ind_Proposed BOQ.xlsx |
2000109774 |
OSP-OFN-AC0130 |
Installation of 8C fiber cable with 4 core tubes (G.652.d) - Aerial |
m |
383.00 |
394.0 |
150,902.00 |
| 17 |
CM1528_KDU_Werahera_Ind_Proposed BOQ.xlsx |
2000109779 |
OSP-OFN-SU9040 |
Supply of 8C fiber cable with 4 core tubes (G.652.d) - Aerial (Corning core, Prysmian,YOFC, ZTT or anyother Dialog approved cables) |
m |
247.00 |
441.0 |
108,927.00 |
| 18 |
CM1528_KDU_Werahera_Ind_Proposed BOQ.xlsx |
2000109841 |
OSP-OFN-IBW8PP |
Installation of 8 fiber Patch Panel |
Each |
3,270.00 |
1.0 |
3,270.00 |
| 19 |
CM1528_KDU_Werahera_Ind_Proposed BOQ.xlsx |
2000109848 |
OSP-OFN-SU8PP |
Supply of 8 fiber Patch Panel_(Commscope, Grandway, C&D or anyother Dialog approved brands) |
Each |
17,700.00 |
1.0 |
17,700.00 |
| 20 |
CM1528_KDU_Werahera_Ind_Proposed BOQ.xlsx |
2000109906 |
OSP-OFN-IBW8530 |
Supply & installation of 25mm flexible conduit (Indoor spiral) |
m |
1,100.00 |
1.0 |
1,100.00 |
| 21 |
CM1528_KDU_Werahera_Ind_Proposed BOQ.xlsx |
2000109909 |
OSP-OFN-IBW8520 |
Supply and Installation of flexible hose including all accessories(Green Hose) - 25mm |
m |
1,850.00 |
4.0 |
7,400.00 |
| 22 |
CM1528_KDU_Werahera_Ind_Proposed BOQ.xlsx |
2000109910 |
OSP-OFN-IBW8750 |
Supply and Installation of PVC including all accessories - 25mm |
m |
1,640.00 |
145.0 |
237,800.00 |
| 23 |
CM1528_KDU_Werahera_Ind_Proposed BOQ.xlsx |
2000109813 |
OSP-OFN-AC0770 |
Installation of Poles and Accessories; 6.7m pole |
Per pole |
6,944.00 |
8.0 |
55,552.00 |
| 24 |
CM1528_KDU_Werahera_Ind_Proposed BOQ.xlsx |
2000109818 |
OSP-OFN-SU9970 |
Supply Poles; 6.7m pole (LL)_(AGGA, PATHMA or any other Dialog approved) |
per pole |
15,300.00 |
8.0 |
122,400.00 |
| 25 |
CM1528_KDU_Werahera_Ind_Proposed BOQ.xlsx |
2000109814 |
OSP-OFN-AC0780 |
Installation of Poles and Accessories; 8m pole |
Per pole |
7,616.00 |
4.0 |
30,464.00 |
| 26 |
CM1528_KDU_Werahera_Ind_Proposed BOQ.xlsx |
2000109819 |
OSP-OFN-SU9980 |
Supply Poles; 8m pole_(AGGA, PATHMA or any other Dialog approved) |
per pole |
26,000.00 |
4.0 |
104,000.00 |
| 27 |
CM1528_KDU_Werahera_Ind_Proposed BOQ.xlsx |
2000109860 |
OSP-OFN-FTD7140 |
Bonding Messenger wire of Aerial Fiber Cables to an existing earth |
Each |
1,860.00 |
1.0 |
1,860.00 |
| 28 |
CM1528_KDU_Werahera_Ind_Proposed BOQ.xlsx |
2000109861 |
OSP-OFN-FTD7130 |
Grounding Messenger wire of Aerial Fiber Cables |
Each |
4,790.00 |
1.0 |
4,790.00 |
| 29 |
CM1528_KDU_Werahera_Ind_Proposed BOQ.xlsx |
2000109876 |
OSP-OFN-50PVCRP |
Supply and Installation of 50mm PVC Riser pipe for concrete pole |
m |
3,200.00 |
12.0 |
38,400.00 |
| 30 |
CM1528_KDU_Werahera_Ind_Proposed BOQ.xlsx |
2000109880 |
OSP-OFN-SU10070 |
Supply of Box type HH-Type 2 (600*1000-Inner diameter) |
Each |
182,000.00 |
1.0 |
182,000.00 |
| 31 |
CM1528_KDU_Werahera_Ind_Proposed BOQ.xlsx |
2000109879 |
OSP-OFN-UG2700 |
Installation of HH-Type 2 at the same time of network development |
Each |
61,824.00 |
1.0 |
61,824.00 |
| 32 |
CM1528_KDU_Werahera_Ind_Proposed BOQ.xlsx |
2000109894 |
OSP-OFN-UG2040 |
Supply & Installation of 40mm HDPE duct underground at 350mm depth with slab protection & sand/Quarry dust, warning tapes, backfilling and Reinstatement with Asphalt/Concrete - 2 way |
m |
6,680.00 |
2.0 |
13,360.00 |
| 33 |
CM1528_KDU_Werahera_Ind_Proposed BOQ.xlsx |
2000109895 |
OSP-OFN-UG2060 |
Supply & Installation of 40mm HDPE duct underground at 350mm depth with slab protection & sand/Quarry dust, warning tapes, backfilling and Reinstatement with Gravel - 2 way |
m |
5,860.00 |
5.5 |
32,230.00 |
| 34 |
CM1528_KDU_Werahera_Ind_Proposed BOQ.xlsx |
2000109885 |
OSP-OFN-MT5690 |
Supply & Installation of 40mm HDPE duct 2 way using Dry Micro Trenching method |
m |
5,580.00 |
315.0 |
1,757,700.00 |
| 35 |
CM1528_KDU_Werahera_Ind_Proposed BOQ.xlsx |
2000079913 |
OSP-OFN-IBW8200 |
Building connectivity- 1 Way 40mm HDPE mounting on the wall with GI pipe protection. |
m |
8,870.00 |
2.0 |
17,740.00 |
| 36 |
CM1528_KDU_Werahera_Ind_Proposed BOQ.xlsx |
2000109858 |
OSP-OFN-IBW8790 |
Supply and installation of patch cord (SC/UPC) - 1m |
Each |
1,360.00 |
2.0 |
2,720.00 |