| 1 |
Survey BOQ KU5005_Kurunegala Hospital Nursing College Lamp.xlsx |
2000109830 |
OSP-OFN-WLA |
Obtaining way leave |
Per Authority |
68,750.00 |
1.0 |
68,750.00 |
| 2 |
Survey BOQ KU5005_Kurunegala Hospital Nursing College Lamp.xlsx |
2000109862 |
OSP-OFN-SR12000 |
Service cost per location for OFN rearrangement work |
Each |
18,000.00 |
3.0 |
54,000.00 |
| 3 |
Survey BOQ KU5005_Kurunegala Hospital Nursing College Lamp.xlsx |
2000109865 |
OSP-OFN-TT4730 |
Splicing 2 core |
Each |
3,400.00 |
1.0 |
3,400.00 |
| 4 |
Survey BOQ KU5005_Kurunegala Hospital Nursing College Lamp.xlsx |
2000109813 |
OSP-OFN-AC0770 |
Installation of Poles and Accessories; 6.7m pole |
Per pole |
6,944.00 |
6.0 |
41,664.00 |
| 5 |
Survey BOQ KU5005_Kurunegala Hospital Nursing College Lamp.xlsx |
2000109814 |
OSP-OFN-AC0780 |
Installation of Poles and Accessories; 8m pole |
Per pole |
7,616.00 |
5.0 |
38,080.00 |
| 6 |
Survey BOQ KU5005_Kurunegala Hospital Nursing College Lamp.xlsx |
2000109818 |
OSP-OFN-SU9970 |
Supply Poles; 6.7m pole (LL)_(AGGA, PATHMA or any other Dialog approved) |
per pole |
15,300.00 |
6.0 |
91,800.00 |
| 7 |
Survey BOQ KU5005_Kurunegala Hospital Nursing College Lamp.xlsx |
2000109819 |
OSP-OFN-SU9980 |
Supply Poles; 8m pole_(AGGA, PATHMA or any other Dialog approved) |
per pole |
26,000.00 |
5.0 |
130,000.00 |
| 8 |
Survey BOQ KU5005_Kurunegala Hospital Nursing College Lamp.xlsx |
2000109822 |
OSP-OFN-AC1060 |
Normal pole concreting |
per pole |
8,350.00 |
2.0 |
16,700.00 |
| 9 |
Survey BOQ KU5005_Kurunegala Hospital Nursing College Lamp.xlsx |
2000109861 |
OSP-OFN-FTD7130 |
Grounding Messenger wire of Aerial Fiber Cables |
Each |
4,790.00 |
1.0 |
4,790.00 |
| 10 |
Survey BOQ KU5005_Kurunegala Hospital Nursing College Lamp.xlsx |
2000109860 |
OSP-OFN-FTD7140 |
Bonding Messenger wire of Aerial Fiber Cables to an existing earth |
Each |
1,860.00 |
1.0 |
1,860.00 |
| 11 |
Survey BOQ KU5005_Kurunegala Hospital Nursing College Lamp.xlsx |
2000109828 |
OSP-OFN-SU10100 |
Supply and Installation of extension bracket Horizontal, 1m |
Each |
13,100.00 |
1.0 |
13,100.00 |
| 12 |
Survey BOQ KU5005_Kurunegala Hospital Nursing College Lamp.xlsx |
2000109855 |
OSP-OFN-IBW8020 |
Supply and installation of Fiber wall socket (with 2 SC/UPC adoptors) |
Each |
2,240.00 |
1.0 |
2,240.00 |
| 13 |
Survey BOQ KU5005_Kurunegala Hospital Nursing College Lamp.xlsx |
2000109856 |
OSP-OFN-IBW8090 |
Supply and Installation of one No.of Pigtail (SC/UPC) and terminating one indoor fiber core inside the Fiber Wall Socket (FWS) |
Each |
3,000.00 |
2.0 |
6,000.00 |
| 14 |
Survey BOQ KU5005_Kurunegala Hospital Nursing College Lamp.xlsx |
2000109871 |
OSP-OFN-TT4510 |
Termination of 2 core in OFC |
Each |
3,668.00 |
1.0 |
3,668.00 |
| 15 |
Survey BOQ KU5005_Kurunegala Hospital Nursing College Lamp.xlsx |
2000109874 |
OSP-OFN-TT4620 |
Testing of 2 core in OFC |
Each |
644.00 |
1.0 |
644.00 |
| 16 |
Survey BOQ KU5005_Kurunegala Hospital Nursing College Lamp.xlsx |
2000109876 |
OSP-OFN-50PVCRP |
Supply and Installation of 50mm PVC Riser pipe for concrete pole |
m |
3,200.00 |
16.5 |
52,800.00 |
| 17 |
Survey BOQ KU5005_Kurunegala Hospital Nursing College Lamp.xlsx |
2000109894 |
OSP-OFN-UG2040 |
Supply & Installation of 40mm HDPE duct underground at 350mm depth with slab protection & sand/Quarry dust, warning tapes, backfilling and Reinstatement with Asphalt/Concrete - 2 way |
m |
6,680.00 |
171.0 |
1,142,280.00 |
| 18 |
Survey BOQ KU5005_Kurunegala Hospital Nursing College Lamp.xlsx |
2000109908 |
OSP-OFN-IBW8350 |
Supply and Installation of flexible hose including all accessories(Green Hose) - 56mm |
m |
2,300.00 |
2.0 |
4,600.00 |
| 19 |
Survey BOQ KU5005_Kurunegala Hospital Nursing College Lamp.xlsx |
2000109909 |
OSP-OFN-IBW8520 |
Supply and Installation of flexible hose including all accessories(Green Hose) - 25mm |
m |
1,850.00 |
3.0 |
5,550.00 |
| 20 |
Survey BOQ KU5005_Kurunegala Hospital Nursing College Lamp.xlsx |
2000109910 |
OSP-OFN-IBW8750 |
Supply and Installation of PVC including all accessories - 25mm |
m |
1,640.00 |
2.0 |
3,280.00 |
| 21 |
Survey BOQ KU5005_Kurunegala Hospital Nursing College Lamp.xlsx |
2000109911 |
|
Installation of fiber Cable through PVC/flexible conduit/Green hose/GI flexible/Casing or any attachment |
m |
1,520.00 |
5.0 |
7,600.00 |
| 22 |
Survey BOQ KU5005_Kurunegala Hospital Nursing College Lamp.xlsx |
2000109774 |
OSP-OFN-AC0130 |
Installation of 8C fiber cable with 4 core tubes (G.652.d) - Aerial |
m |
383.00 |
654.0 |
250,482.00 |
| 23 |
Survey BOQ KU5005_Kurunegala Hospital Nursing College Lamp.xlsx |
2000109779 |
OSP-OFN-SU9040 |
Supply of 8C fiber cable with 4 core tubes (G.652.d) - Aerial (Corning core, Prysmian,YOFC, ZTT or anyother Dialog approved cables) |
m |
247.00 |
725.0 |
179,075.00 |